Magnolia Science Academy 1
The Magnolia School Academy #1 project is a new, fully-sprinklered, wood-framed (Type III-B), 3-story classroom building for grades 9 thru 12. The first and second floor includes the build-out of 20 classrooms as well as staff offices, administration spaces, and bio and tech labs. There is a rooftop play area on the 3rd floor. In addition, the project involved patching of the existing parking area.
The Magnolia School Academy #1 project is a new, fully-sprinklered, wood-framed (Type III-B), 3-story classroom building for grades 9 thru 12. The first and second floor includes the build-out of 20 classrooms as well as staff offices, administration spaces, and bio and tech labs. There is a rooftop play area on the 3rd floor. In addition, the project involved patching of the existing parking area.
Oltmans Construction Co. self-performed all carpentry trades including concrete, drywall, framing, and doors/frames/hardware. The project was delivered on a fast-track delivery to ensure opening by the the fall. The Magnolia Public Charter School project is privately funded and is on private property. Therefore, the project is not under DSA.
“Oltmans Construction Co. created a space where our students can learn and thrive. I can talk about how amazing it was working with the Oltmans team all day, instead, I will just say that they have become a part of our Magnolia family. They took our vision and made it ten times better than what we could have ever imagined. Every door, tile, and color selection was purposefully designed to foster creativity. Now our students thrive within those walls.”
– Mustafa Sahin, Principal of Magnolia Science Academy #1
Square Footage: 25,228 s.f.