The first-ever commercial vehicle EV charging hub in Southern California.
1 / 3
No items found.
Owner: Terawatt Infrastructure
Architect: Black and Veatch Corp
Square Footage: 95,000 s.f.
Demolition of existing site and construction of a vehicle EV charging hub, allowing up to thirteen (13) semi-truck charging at once. These stations will be equipped with chargers that are the fastest available charging speeds which are 350kW
Up to 540A and 350kW with 95% power conversion efficiency
Space saving from distributed architecture
OCPP and network connectivity for seamless system integration